Quantile Capital Cannot Meet Demand

Consulting
hard45 min0 submissions
Amazon
Scenario

Quantile Capital (asset management, UK) is turning away orders. Demand runs at 2468 units per week, but the plant cannot keep up, and the sales team reports losing deals to competitors on lead time.

Line capacity by stage (units per week):

StageCapacity
1. Intake and preparation2395
2. Primary processing1435
3. Assembly1768
4. Finishing and dispatch1586

The plant manager has requested £155 M for new finishing equipment, which would add 482 units per week of finishing capacity. He argues the finishing area "is where the queues are visible".

An external contractor has offered to take overflow work at a 40% cost premium over in-house production, available within six weeks.

Supporting data

options

finishing capex m
155
outsourcing lead time weeks
6
outsourcing cost premium pct
40
finishing capacity added units
482
demand units per week2468

stage capacity units per week

assembly
1768
primary processing
1435
finishing and dispatch
1586
intake and preparation
2395
Your task

Advise the operations director. Provide:

  1. Analysis — where is the real constraint, and what is the plant's actual throughput?
  2. Risks — of each option under consideration.
  3. Recommendation — what to do, in what order.

Address the plant manager's capex request directly.

Ready to move forward? Up next: Solstice Travel: Plenty of Demand, Nothing to BuyNext question
How you'll be graded

100 points, 60% to pass.

  • recommendation25
  • options evaluation20
  • bottleneck analysis30
  • problem structuring25
Hint
Reveal suggested structure
  1. Throughput = the capacity of the slowest stage. Identify it.
  2. Quantify the gap between demand and that constraint.
  3. Test each option against the constraint — capacity added anywhere else is wasted.
  4. Cost per unit of added throughput for each option.
  5. Recognise the constraint moves once the current one is relieved.